Mountain View High School



Architect



Project Team



Location

  • 3901 W. Linda Vista Blvd.
    Tucson, AZ


Related Links



Description

  • New 40,000 square foot Gymnasium building and 27,000 square foot 2-story science classroom buildings. Science classroom buildings included classrooms, full laboratory classrooms and computer classrooms. Prepared HVAC, plumbing, and complete fire sprinkler system design with hydraulic calculations for all buildings in the project. The HVAC design included new stand-alone 4-pipe central plant (air cooled chillers and natural gas fired boilers) for the gymnasium building, textile air distribution system in the gym, CO2 based ventilation controls for the gym, and fume hood design for laboratory classrooms. Plumbing design incorporated an acid waste and neutralization system.


Photos

  • Coming soon...